The quality control of TBM excavation construction mainly includes the following aspects:
Mechanical equipment maintenance and monitoring: Ensuring the good condition of TBM mechanical equipment is the foundation of construction quality. Regular maintenance and overhaul of the cutterhead, propulsion device, control system, etc. are required, and strict quality inspections must be carried out to ensure compliance with relevant standards and requirements. During the construction process, real-time monitoring of mechanical equipment is also necessary to promptly detect and handle equipment abnormalities

Geological investigation and analysis: Geological conditions are an important factor affecting the quality of TBM excavation construction. Detailed geological survey and testing should be conducted before construction to evaluate and determine the geological conditions. According to different geological conditions, corresponding measures should be taken, such as increasing support measures for loose strata and improving groundwater levels. At the same time, real-time monitoring of geological conditions should be carried out to adjust construction plans in a timely manner
Execution of construction standards and specifications: Strictly implement construction standards and specifications, especially for the construction of key links and important parts. Before construction, relevant personnel should be organized for training and assessment to ensure that the construction personnel have the corresponding knowledge and skills. Strict quality control must be carried out during the construction process, with full monitoring and recording of construction quality, and timely detection and handling of construction defects and problems
Quality control of pipe installation: Pipe installation is an important part of TBM construction. Strict quality control must be carried out after the entry of pipe segments to ensure that unqualified pipe segments do not enter the tunnel for use. When assembling pipe segments, it is necessary to select reasonable assembly points, use skilled technicians for assembly, and regularly inspect the pipe segment assembly machine to ensure installation quality
Quality control of backfill grouting behind the wall: Prior to grouting, a mix ratio test must be conducted to select the optimal mix ratio, which should be adjusted in a timely manner according to geological conditions. During the grouting process, it is necessary to ensure that the grouting is full and the speed matches the excavation speed. The filling of pea gravel should be full and the speed should be controlled well
Safety management: TBM excavation construction is a complex project with high safety risks. It is necessary to establish comprehensive safety regulations, conduct training and education, and enhance employees' safety awareness. Take protective measures such as installing explosion-proof equipment and strengthening ventilation to ensure the safety of the construction site